Demobilisation waste services on a $1.8 billion infrastructure project
When the incumbent couldn't commit to a date, Evoro cleared 138 drums of grease in two days — and kept a nationally significant project on schedule.
During the demobilisation of two sites on a $1.8 billion Sydney Metro tunnelling project, a Tier 1 infrastructure contractor was struggling to get its existing waste provider to commit to collection dates — putting a penalty-bound deadline at risk. Evoro stepped in, matched the incumbent's price, and committed to clearing the site within days. An initial scope of a couple of IBCs grew into roughly $330,000 of work across three sites.
Sydney metro tunnelling
138 drums
of grease cleared in 2 days, when the incumbent couldn’t commit to a date
The story

The Situation

Evoro was engaged to provide waste services during the demobilisation of two sites forming part of a $1.8 billion, nationally significant Sydney Metro tunnelling project, delivered by a Tier 1 infrastructure contractor and its joint venture partner.

Demobilising sites of this kind runs to strict timeframes, with financial penalties if the contractor isn’t off site by set dates. The client was struggling to get its incumbent waste provider to commit to pickup dates — putting that timeline, and the penalties attached to it, at risk.

key steps

Our Approach

Evoro attended site to assess an initial scope of a couple of IBCs of liquid waste, then quickly identified a far wider set of needs. This involved several key steps:

Look beyond the initial brief to identify every waste stream across the site — including 138 drums (205-litre) of grease the client urgently needed removed.

The incumbent had quoted and held a purchase order but would not commit to a collection date. Evoro matched the price and committed to clearing the drums within three days, winning the work on the spot.

Provide packaged hazardous waste removal, bulk non-DG liquid waste removal — including vacuum tanker work to empty tanks so they could be moved — and broader industrial services across three sites.

The outcome

The Results

The 138 drums were cleared within two days. By reacting quickly and handling multiple waste streams in a single engagement, Evoro removed a compliance and timeline risk and kept the demobilisation on track.

An initial scope worth around $25,000 to $30,000 grew into approximately $330,000 of work across three sites, delivered over a four-to-six-week demobilisation window.

The engagement reinforced Evoro’s position as a responsive, one-stop provider on a major infrastructure project — trusted to deliver where the incumbent could not keep pace.

Why it matters

On a major build, responsiveness is the whole value.

Evoro’s scope was a small fraction of a $1.8 billion project — but being trusted to deliver inside a build of that calibre, at the speed a penalty-bound deadline demands, is the credibility signal. Speed and a single point of accountability are what kept the demobilisation on track.